Cloakroom
- Location: Greenfield, Saddleworth
- Installed in: 2015
- Timescale: 4 days
Details:
The before photos show the transformation of this Cloakroom. The room was half tiled in Contact Grey porcelain tiles. Storage was provided in a basin unit. Heating was a concern in this room so we installed a Faral aluminium radiator. A contemporary room that’s now practical in design.